I managed to get the majority of my pieces cut by the laser cutter before the plug was pulled- the benefit of being prepared early I guess.
My site model is nearly complete so it's time to get my installation all figured out.
I plan to portray the forgotten aspects of of electrical infrastructure through projection.
The phases I'm going to portray (bad electrical pun- accidental I swear) are:
-Generation
-Alteration (transforming)
-Monitoring, Correcting
-Transfer
The modes of display are light, audio, and physical projection (shadows, sounds, and components breaking out of the buildings interior space)
Showing posts with label electrical. Show all posts
Showing posts with label electrical. Show all posts
Tuesday, February 26, 2008
Subscribe to:
Posts (Atom)
