Wednesday, April 2, 2008

Drawings

I've been working on the mechanisms that are going to be placed within my site model. I've determined the types of mechanisms required for my design and have began to place them within the model in such a way as to provide an even density within the entire volume. I transferred the hydro tower aesthetic to the interior of the building. This type of construction makes sense for what I'm building in a couple of ways: it's a strong, yet relatively transparent construction method that uses the same materials I'm already working with while also bridging the gap between inside and outside visually.
I expect to have at least a couple more mechanisms as additional relationships and requirements are stumbled upon during construction.


No comments: